D/H Product/chemical tanker-2009 Indonesia

FOR  STRAIGHT  SALE  ONLY D/H Product/chemical tanker

M/T INTAN PREMIER

=================

Year of Build:  2009

Build: Indonesia

Flag: Singapore

Details:

D/H Product/chemical tanker

LR Class

Coating: epoxy

11,000 dwt on 7.8 m ssw

TPCM 21.75 mt

LOA/LBP/Beam/Depth: 137/129/18.8/10.8 m

10 cargo tanks: 13,000 cbm

2 slop tanks: 567 cbm

Cgo pumps: 4 x 500 cbm/hour, 2 x 50 cbm/hour (stripping)

Segregation: 4 grades

Heating Capacity: steam heating, max. ldg/disch temperature 70 degree C.

M/E: 1 x MAK 6M43, rated at 6,000 KW

Main Genset: 3 x Cummins KTA19DM with Newage AVK-SEG

                        HCM534E alternators, each rated at 450 KW

Emergency Genset: 1 x Cummins 6CTA8.3-D(M) with Newage

AVK-SEG UCM274F,  rated at 181 KW

Propeller: Scana Volda Type ACG105, 4300mm DIA,

                 4-bladed CPP, Counterclockwise Rotation

Bow Thruster: 1 x Rolls Royce Kamewa-Ulstein TT1650AUX

                         CP Tunnel Thruster, rated at 670 KW

Shaft Generator: 1 x Mocotech PTF, rated at 1,200 KW

Bunker  Capacity:  

  IFO:     586 cbm (100%)

  MDO:  135 cbm (100%)

Ballast Water Capacity: 5,234 cbm

BUNKER. CONSUMPTION:

1)  Ship laded speed  and daily bunker consumption : 10.0KNOT; FO-380CST/18.5MT;

                                                     MGO: 1.8 MT/DAY

2)  Ship ballast speed and daily bunker consumption : 10.5KNOT/FO-380CST 18.0MT;

                                                   MGO: 1.8 MT/DAY

3)  Ship bunker consumption for heating ( 24 hours ) : FO-380: 14.8MT/DAY    

4)  Daily Bunker consumption for loading operation including ballasting  : MGO: 2.0MT/DAY

5)  Daily Bunker consumption for discharge  operation including ballasting and inerting ( ? ) : MGO: 6.5MT/DAY

6)  Daily Bunker consumption idle at anchorage : MGO:1.5MT/DAY

7)  TIME for tanks cleaning for change from black cargo to white cargo (CPP)  : 7 DAYS

8)  Bunker consumption need for 7)  : FOR HEATING 3 DAY FO-380cst : 6.5MT X                            MGO:  1.8MT/DAY x 7 DAYS = 12.6 MT

9)  Bunker consumption for inerting all tanks from gas free condition : MGO: 5.8MT

+  +

REGULARLY  CALLING  SINGAPORE  WHERE  CAN  ARRANGE  INSPECTION

AND  DELIVERY

LIM