Built 1997, modified in 2008 Class IRS Dims 87 m x 27.5 m x 5.4 m Deck Space ~1000 m2 ( possible to increase) Accommodation 364 pax Crane 350 Tons Manitowac Additional 8 Points Mooring
SPS compliant
Helideck Location: Arabian Gulf
Price and Further details can be provided against SERIOUS NAMED INTEREST
Subject to prior commitment, BOD approval, unsold, unchartered
FIRE FIGHTING & LIFE SAVING EQUIPMENT: ∙ Automatic Sprinkler System ∙ Water Mist system for Machinery Room ∙ Automatic Fire and Smoke Detection System ∙ Fire Monitor System Rescue Boat
2 x 6 men SOLAS/USCG approved Life Raft :
26 x 25 men SOLAS/USCG approved Life Jacket :
650 units SOLAS approved
COMMUNICATION & NAVIGATION EQUIPMENTS: GMDSS VHF :
1 x Furuno RC-1800F Navtex Receiver :
2 x Furuno GM-300 EPIRB :
2 x Mcmurdo S4 GPS :
1 x Furuno GP 150 Gyro Compass :
1 x Raytheon Anschute 110-233 All details given about wog.
Mud Pit Agitator……… 2 x Lightening Agitator 85Q20, 15” X 7.9”X 8.9”, 20HP Motors
2 x Lightening Agitator 85Q20, 15” X 16.6”X 8.9”, 20HP Motors
1 x Rumba Agitator 10.5” X 4.6”X 8.9”, 3HP Motors
Auxiliary Pumps…… Mission Magnum 6”x8”x10.5” Centrifugal Pumps,100 HP Motor.
Mission Magnum 5”x6”x10.5” Centrifugal Pumps,75 HP Motor.
Mission Magnum 5”x6”x10.5” Centrifugal Pumps,100 HP Motor.
Air System Air Dryer………………………………………………………………….. 1…. x 2040.38 m3/hr.
Air Receiver in engine room………………………………………………………. 1… x 2 m3.
Air Receiver in air compressor room…………………………………………….. 1…. x 4 m3.
Mooring System Forward side………….. 4 x 35 MT Winches with1200m of 36mm dia steel wire rope.
Aft side…………………. 4 x 35 MT Winches with1200m of 36mm dia steel wire rope.
Crane Port Side……………………………………. NOV 60-DNS-120 with 120ft.Boom Length
STBD Side………………………. Modified…. NOV 60-DNS-120 with 140ft.Boom Length
These specifications are intended for general reference purposes only, as actual equipment and specifications may vary based upon subsequent changes, the contract situation and customer needs. All equipment shall be operated and maintained at all times, in compliance with Ocean Oilfield standard operating manuals, policies and procedures, and within its stated operational limits or continuous rated capacity, in order to assure maximum operational efficiency.